Shasta County Crag View WTP Improvement Project

Shasta County Crag View WTP Improvement Project

This $1.4M project consisted of converting the existing water treatment plant into a headworks-only building, installing two new raw water pumps, building a new water treatment plant at the existing storage tank site, recoating a 200,000-gallon storage tank, and...
BVWD Backwash Recycle Project

BVWD Backwash Recycle Project

The work consists of construction of the following improvements: • Approximately 700 feet of 24-inch water line• Approximately 371 feet of 8-inch water line• Approximately 110 feet of 10-inch water line• Pump station including two vertical turbine, 25-HP pumps• Block...
QUINCY CSD 2012 SEWER COLLECTION REPLACEMENT PROJECT

QUINCY CSD 2012 SEWER COLLECTION REPLACEMENT PROJECT

The 2012 Wastewater Collection System Rehabilitation Project consisted of installing sewer mains, lateral replacement, individual SS lateral cleanout installations, and replumbing and relocating laterals for about 11 homes....
BPWD 2014 WATER SYSTEM UPGRADES

BPWD 2014 WATER SYSTEM UPGRADES

The project consists of constructing a 200,000-gallon welded steel potable water storage tank, activated carbon filters, backwash recycling, generators and a new SCADA system....
Dollar General – Dunsmuir

Dollar General – Dunsmuir

This project included surveying and engineering services for site development for Dollar General in Dunsmuir, CA....
Dollar General – Portola

Dollar General – Portola

This project included surveying and engineering services for site development for Dollar General in Portola, California....
Tuscan Gardens

Tuscan Gardens

Redding is home to an assisted living facility that will feature many amenities and provide special secured apartments and grounds for the residents.  Completed in late 2007, the 70,000-square-foot facility will feature 84 apartments, as well as common dining and...
Dollar General – Palo Cedro

Dollar General – Palo Cedro

PACE provided civil engineering and surveying services for the new Dollar General store in Palo Cedro. Troy Jones designed the project site including drainage and utility improvements, and the project was managed by Fred Lucero. The store opened to the public in...