This $1.4M project consisted of converting the existing water treatment plant into a headworks-only building, installing two new raw water pumps, building a new water treatment plant at the existing storage tank site, recoating a 200,000-gallon storage tank, and...
The work consists of construction of the following improvements: • Approximately 700 feet of 24-inch water line• Approximately 371 feet of 8-inch water line• Approximately 110 feet of 10-inch water line• Pump station including two vertical turbine, 25-HP pumps• Block...
The 2012 Wastewater Collection System Rehabilitation Project consisted of installing sewer mains, lateral replacement, individual SS lateral cleanout installations, and replumbing and relocating laterals for about 11 homes....
The Filtration and UV Disinfection Project consisted of the installation of a traveling bridge filter and an open channel, gravity flow, Trojan UV3000Plus UV disinfection system....
The project consists of constructing a 200,000-gallon welded steel potable water storage tank, activated carbon filters, backwash recycling, generators and a new SCADA system....
Redding is home to an assisted living facility that will feature many amenities and provide special secured apartments and grounds for the residents. Completed in late 2007, the 70,000-square-foot facility will feature 84 apartments, as well as common dining and...
PACE provided civil engineering and surveying services for the new Dollar General store in Palo Cedro. Troy Jones designed the project site including drainage and utility improvements, and the project was managed by Fred Lucero. The store opened to the public in...