Shasta County Administration Center
The project consisted of a 3-story, 106,000-square-foot administration office and a 3-story, 100,000-square-foot parking structure. The office facility was framed with structural steel. The parking structure was framed with precast, prestressed concrete.
View 202 Restaurant
This project consisted of vacant lot improvements including site grading, demolition and removal of existing features, and construction of a precast concrete screen wall.
The Vistas Senior Housing
PACE provided civil engineering for The Vistas Assisted Living and Memory Care in Redding. Fred Lucero was the project manager and designed the project site including drainage and utility improvements.
Oakmont Senior Living
PACE provided engineering and surveying services for this luxury retirement community including: Boundary, Topography, and ALTA Surveys Record of Survey Map Grading and Drainage Plan including MS4 BMP's Utility Plans SWPPP
Dollar General – Redding
This project included surveying and engineering services for site development for Dollar General in Redding, CA.
Waste Management Redding CNG Upgrade
This project consisted of the installation of a Compressed Natural Gas (CNG) Fueling Upgrade. Proposed improvements included a time-fill fueling for up to 28 trucks, shop modifications to accommodate maintenance of CNG vehicles, and defueling.
City of Yreka 2013 Fall Creek Water System Improvements
The project consisted of a headworks expansion, new diffused air system, new centrifuge sludge dewatering facility, a new drainage return pump station, and chlorine contact basin modifications. Garett Hattenhauer was the project manager.
City of Mt. Shasta Water Meter Installation Project
The project consisted of a headworks expansion, new diffused air system, new centrifuge sludge dewatering facility, a new drainage return pump station, and chlorine contact basin modifications. Garett Hattenhauer was the project manager.
SCSD/COR Intertie Pump Station
The project consisted of a headworks expansion, new diffused air system, new centrifuge sludge dewatering facility, a new drainage return pump station, and chlorine contact basin modifications. Garett Hattenhauer was the project manager.
Shasta County Elk Trail Water Improvement Project
The project consisted of a headworks expansion, new diffused air system, new centrifuge sludge dewatering facility, a new drainage return pump station, and chlorine contact basin modifications. Garett Hattenhauer was the project manager.
Shasta County Crag View WTP Improvement Project
The project consisted of a headworks expansion, new diffused air system, new centrifuge sludge dewatering facility, a new drainage return pump station, and chlorine contact basin modifications. Garett Hattenhauer was the project manager.
BVWD Backwash Recycle Project
The project consisted of a headworks expansion, new diffused air system, new centrifuge sludge dewatering facility, a new drainage return pump station, and chlorine contact basin modifications. Garett Hattenhauer was the project manager.
QUINCY CSD 2012 SEWER COLLECTION REPLACEMENT PROJECT
The project consisted of a headworks expansion, new diffused air system, new centrifuge sludge dewatering facility, a new drainage return pump station, and chlorine contact basin modifications. Garett Hattenhauer was the project manager.
SUSANVILLE SANITARY DISTRICT FILTRATION AND UV DISINFECTION PROJECT
The project consisted of a headworks expansion, new diffused air system, new centrifuge sludge dewatering facility, a new drainage return pump station, and chlorine contact basin modifications. Garett Hattenhauer was the project manager.
CITY OF WILLIAMS WATER SYSTEM IMPROVEMENTS
The project consisted of a headworks expansion, new diffused air system, new centrifuge sludge dewatering facility, a new drainage return pump station, and chlorine contact basin modifications. Garett Hattenhauer was the project manager.
BPWD 2014 WATER SYSTEM UPGRADES
The project consisted of a headworks expansion, new diffused air system, new centrifuge sludge dewatering facility, a new drainage return pump station, and chlorine contact basin modifications. Garett Hattenhauer was the project manager.
Dollar General – Dunsmuir
This project included surveying and engineering services for site development for Dollar General in Dunsmuir, CA.
Dollar General – Portola
This project included surveying and engineering services for site development for Dollar General in Portola, California.
Tuscan Gardens
Redding is home to an assisted living facility that will feature many amenities and provide special secured apartments and grounds for the residents. Completed in late 2007, the 70,000-square-foot facility will feature 84 apartments, as well as common dining and...
Dollar General – Palo Cedro
PACE provided civil engineering and surveying services for the new Dollar General store in Palo Cedro. Troy Jones designed the project site including drainage and utility improvements, and the project was managed by Fred Lucero. The store opened to the public in...
Win River Casino Expansion & Hotel Project
PACE provided electrical design and construction services for the new Win River Casino Addition and Hotel Tower Addition. Gifford Construction was the general contractor and Thalden Boyd Emery was the project Architect. The new addition and renovation to the casino...
Humboldt County Veterans Building Seismic Project
The project included modification of the existing electrical service, modification of the building electrical distribution to accommodate modifications, building lighting design, and fire alarm design.
CITY OF REDDING ARC FLASH STUDY FOR WATER FACILITIES
Complete Arc Flash Study Report per NFPA 70E for each well and pump station. The report includes a detailed description of each well or pump station, a basic floor plan to scale, electric service and MCC elevations, and analysis of each panel, and an Arc Flash...
VETERANS WALK OF HONOR
This project consisted of vacant lot improvements including site grading, demolition and removal of existing features, and construction of a precast concrete screen wall.
WASTEWATER TREATMENT AND COLLECTION SYSTEM IMPROVEMENTS PROJECT
The project consisted of a headworks expansion, new diffused air system, new centrifuge sludge dewatering facility, a new drainage return pump station, and chlorine contact basin modifications. Garett Hattenhauer was the project manager.
Fire Hall in Arcata, CA
The Fire Hall in Arcata, CA underwent a complete renovation in 2016. This included upstairs living quarters, an apparatus bay, offices, support spaces, and exterior improvements. PACE Engineering provided the electrical engineering for the project which included...