The project consisted of a 3-story, 106,000-square-foot administration office and a 3-story, 100,000-square-foot parking structure. The office facility was framed with structural steel. The parking structure was framed with precast, prestressed concrete....
This project consisted of vacant lot improvements including site grading, demolition and removal of existing features, and construction of a precast concrete screen...
PACE provided civil engineering for The Vistas Assisted Living and Memory Care in Redding. Fred Lucero was the project manager and designed the project site including drainage and utility improvements....
PACE provided engineering and surveying services for this luxury retirement community including: Boundary, Topography, and ALTA Surveys Record of Survey Map Grading and Drainage Plan including MS4 BMP’s Utility Plans SWPPP...
This project consisted of the installation of a Compressed Natural Gas (CNG) Fueling Upgrade. Proposed improvements included a time-fill fueling for up to 28 trucks, shop modifications to accommodate maintenance of CNG vehicles, and defueling....
The project included multiple components: expanding a pump station, adding in-line filtration and treatment capability, new filters, pump station upgrades including remote monitoring and control capabilities, adding a recycling system for backwash containment and...
This project consisted of installing approximately 1,636 automatic-read water meters on existing water services and providing 63 additional and spare meters....
The Shasta CSD/City of Redding Intertie Pump Station Project consisted of the construction of a pump station and intertie to the City of Redding’s 30-inch Buckeye Transmission Main at the intersection of Bandana Trail and Rock Creek Road...
The Elk Trail Water Improvement Project included 67,000 feet of water main, two storage tanks, a booster pump station, radio telemetry and control improvements, and modifications to existing treatment facilities....